Skip to main content
Preparatory work in the Brossard area

Preparatory work in the Brossard area

Construction activities  | During the night only
Starting April 16, for about 4 weeks. The work will be done solely during weeknights, between 10 p.m. and 5 a.m
South Shore

Nature of the work

The work will involve carrying out geotechnical drilling to assess soil composition and resistance—a prerequisite to designing and constructing the REM infrastructure. The work will begin near the Highway 30 overpass and continue west up to Leduc Boulevard.

 

Impacts 

To ensure the safety of the work team, the left lane of Highway 10 will be closed at night (between 10 p.m. and 5 a.m.) on weekdays in both directions over a distance of 800 m. 

  • Signage will redirect traffic to the right lane.
  • Obstructions will follow the advancement of the geotechnical campaign.
  • There will be no traffic obstructions days and weekends.

For all questions | 1 833 REM-INFO

Write us via the contact form of the "Contact us" page. You may contact us by phone on weekdays between 8:00 am and 5:00 pm.