Skip to main content
Preparatory work in the McGill station area

Preparatory work in the McGill station area

Road
During the day, April 19, 2018
Downtown

Nature of the work

The work involves surveying using instruments on the sidewalk and in the traffic lane. Data capture will be done at specific points along McGill College Avenue.

 

Impact

A single lane per direction will be closed during the day on April 19, 2018, which will allow automobile traffic.

  • The lane closures will be short term;
  • The sidewalk will be accessible to pedestrians at all times;
  • The Eaton Centre parking lot will be accessible all day;
  • Orange cones and a truck with a signal arrow will be on site to redirect traffic and protect the surveyors.

For all questions | 1 833 REM-INFO

Write us via the contact form of the "Contact us" page. You may contact us by phone on weekdays between 8:00 am and 5:00 pm.