Skip to main content
Installation of overhead contact lines

Installation of overhead contact lines

Construction activities  | During the night only
Starting September 11, 2023, until November 2023 Evenings and nights (5 p.m. to 4 a.m.) In progressive sequence from Laval-sur-le-Lac to Île Bigras Station
North Shore

Nature of work:

Work to install overhead contact lines will begin on September 11 along the REM route in the Deux-Montagnes sector. The work involves installing the pendulums and connections that will power the REM cars.

Impacts and mitigation measures: 

Noise may be generated by the work. To minimize impacts, the following measures will be implemented:

  • Activities are sequenced to move progressively through the segment and minimize the exposure period at any one point.
  • Noise levels will be monitored by our environmental experts, and adjustments will be made according to the results.
  • Working methods will be adapted to concentrate the activities likely to generate the most noise during the day.
  • The use of the horn required by safety standards when reversing rail vehicles is prohibited between 7pm and 7am, and warnings of vehicle movements are governed by light signals.
  • As far as possible, all vehicles on site, on track and on the ground, must be equipped with a white noise reversing alarm.
  • Worksite communications are governed by personal radio transmitters or hand signals.

Illustration of catenary power supply:

For all questions | 1 833 REM-INFO

Write us via the contact form of the "Contact us" page. You may contact us by phone on weekdays between 8:00 am and 5:00 pm.