Note: documents published before April 2018 are based on the reference project in the planning phase and therefore no longer represent the REM’s route in some cases. For example, the route was changed in the area of the Peel Basin (elevated track), the Technoparc (underground track to avoid wetlands) and the station Autoroute 13 was removed. Note also that new studies are being carried out when necessary.
Filtered by:
50
documents
meet these criteria
Environment
February 29, 2024, South Shore
(In French) Rapport - Analyse d'efficacité des mesures de mitigation déployées sur la Rive-Sud
Information sheets
December 8, 2023, Downtown | South Shore
Preparing and operating the REM in winter
Information sheets
September 25, 2023, Downtown
Technical presentation to the media - Noise from the REM
Environment
September 25, 2023, Downtown
(In French) Rapport technique - Bruit du passage des voitures du REM sur le segment entre L'Île-des-Soeurs et Griffintown
Information sheets
September 13, 2023, All sectors
Project Update - Réseau express métropolitain
Construction and engineering
July 26, 2023, All sectors
Access Protocol - REM Network
Information sheets
June 7, 2022, All sectors
Presentation given at the 56th AQTr Congress
Construction and engineering
October 26, 2021, Downtown
Public Notice - Canadian Navigable Waters Act - Pont du Canal Lachine
Construction and engineering
August 13, 2021, Downtown
Public Notice - Canadian Navigable Waters Act - Pont du Canal Lachine
Information sheets
June 3, 2021, All sectors
Project Update - June 2021
Information sheets
May 18, 2021, All sectors
Master plan - REM public art program UniR
Construction and engineering
December 18, 2020, North Shore