Skip to main content
reseau
express
metropolitain

Documentation

In this section you will find maps, plans, studies and reports, to help you learn more about the project. Documentation of the REM project planning phase on the CDPQ Infra website.

Note: documents published before April 2018 are based on the reference project in the planning phase and therefore no longer represent the REM’s route in some cases. For example, the route was changed in the area of the Peel Basin (elevated track), the Technoparc (underground track to avoid wetlands) and the station Autoroute 13 was removed. Note also that new studies are being carried out when necessary.

Filtered by:

35 documents meet these criteria
Information sheets September 26, 2019, North Shore

Public information meeting - Deux-Montagnes

Construction and engineering June 18, 2019, All sectors

Technical briefing - June 2019

Information sheets March 29, 2019, All sectors

Living environment - Presentation (Vivre le REM Event)

Information sheets March 29, 2019, All sectors

Trains - Technical sheets (Vivre le REM Event)

Information sheets March 29, 2019, All sectors

Stations - Technical sheets (Vivre le REM Event)

Community February 28, 2019, All sectors

Transitional mitigation network - Information sheets

Community February 28, 2019, All sectors

Transitional mitigation network - Presentation

Construction and engineering November 19, 2018, Montréal (Centre and Airport)

Evaluation for covering the section between the Mont-Royal tunnel’s north portal and Highway 40 (French only)

Information sheets October 9, 2018, All sectors

Noise levels during the REM construction (French only)

Information sheets October 9, 2018, All sectors

Vibrations during the REM construction (French only)

Information sheets October 9, 2018, All sectors

Noise levels during the REM operation (French only)

Information sheets October 9, 2018, All sectors

Vibrations during the REM operation (French only)

Network map
X