Skip to main content
Linear work in the railway right-of-way

Linear work in the railway right-of-way

Construction activities
Fall 2021
North Shore
Linear works in the REM right-of-way (summer 2021)
Linear works in the REM right-of-way (summer 2021)
Linear works in the REM right-of-way (summer 2021)
Linear works in the REM right-of-way (summer 2021)
1 / 2

Nature of the work

Several works are taking place inside the railway right-of-way, between Sainte-Dorothée station and les Érables street, in order to rearrange the tracks for the REM.

 

Work schedule

Calendar Work Impacts and mitigation measures
Summer and fall 2021

Work along the railway right-of-way:

  • Excavation
  • Relocation of drainage pipes, fiber optics, etc.
  • Replacement of the right-of-way fence on the golf side
  • Backfilling
  • When replacing the fence, vegetation intermingled with the old fence shall be cut back (mainly on the golf side)
  • Like any construction site, the work can generate noise, dust, vibrations and trucking

 

For all questions | 1 833 REM-INFO

Write us via the contact form of the "Contact us" page. You may contact us by phone on weekdays between 8:00 am and 5:00 pm.