Skip to main content
Night obstruction – Work to install bridge protection frames

Night obstruction – Work to install bridge protection frames

Road  | Major  | During the night only
During the nights of February 15 to 20, from 9 p.m. to 5 a.m.
Centre of Montréal

Nature of work:

To ensure traffic flow and prevent potential collisions of vehicles that are too large with the bridge structure, REM will carry out work to install protective frames on each side of the viaduct on Marcel-Laurin Boulevard.

To do so, a full closure will be required during the nights of February 15 to 20, between 9 p.m. and 5 a.m.

Map showing the obstruction

Impacts and mitigation measures:

  • Noise , trucking and dust may be noticeable. The teams have been made aware of the management of their equipment in order to minimize the potential impact.
  • Adequate signage will be installed and flaggers will be on site to redirect vehicular and pedestrian traffic.
  • An environmental monitoring will be deployed by environmental experts.

For all questions | 1 833 REM-INFO

Write us via the contact form of the "Contact us" page. You may contact us by phone on weekdays between 8:00 am and 5:00 pm.