Preparatory work in the sector of Côte-des-Neiges-Notre-Dame-De-Grace borough and Town of Mount Royal

Preparatory work in the sector of Côte-des-Neiges-Notre-Dame-De-Grace borough and Town of Mount Royal

Construction activities  | Major
The May 12-13, 19-20-20 and 26-27. The work will be done only during the day, between 9 a.m. and 7 p.m.
Centre of Montréal

Where: in the railway right of way area, mainly around the Canora and Mont-Royal stations / on chemins Canora and Dunkirk.

 

Nature of the work

  • Hydro excavation: digging with a high-pressure water jet and suctioning the loosened material as work progresses; this technique is safe, limits the impact on the immediate environment, generates no dust and reduces the risk of damaging underground infrastructure.
  • Geotechnical drilling: drilling to confirm the soil composition and resistance.
  • Scrubbing and inspection: cleanup of underground utilities using tanker trucks and vacuum trucks, followed by an inspection to confirm that they are working properly.

 

Impact

  • As a safety precaution for the team, part of the right-hand lane of chemin Canora and the left-hand lane of chemin Dunkirk will be closed on alternate days.
  • This identification work may generate noise.

 

Mitigation measures

This identification campaign may generate noise. To minimize the impacts, acoustic screens will be installed around trucks (on all four sides).

For all questions | 1 833 REM-INFO

Write us via the contact form of the "Contact us" page. You may contact us by phone on weekdays between 8:00 am and 5:00 pm.