Skip to main content
reseau
express
metropolitain
Frequently Asked Questions

Will an REM station replace the Chevrier terminal?

The REM Chevrier station is not planned for phase one of the project.

Until the REM’s planned commissioning in 2021, the existing Chevrier terminus will continue to operate. During the construction of the right-of-way and infrastructure required for the REM to travel in the centre of Highway 10, new access ramps and reserved lanes for buses will be built so that public transit service in both directions remains efficient for riders on the South Shore. The access ramps will be constructed in 2018, and be in use starting in 2019.

After the REM is commissioned, the bus station and park-and-ride lot at the Chevrier site will be moved south of Highway 30, to the REM’s Rive-Sud terminal station. The agglomeration of Longueuil aims to keep the Chevrier sector as a transit-oriented development (TOD) area, and the objective is to provide public transport service for this sector, with a method to be determined. To travel downtown, riders in the Chevrier sector will be directed to the REM station that is closest to their departure point.

X